Fair, load-managed EV charging for shared buildings.
Pluggy helps apartment, strata and mixed-use properties plan EV charging that works within building capacity, supports resident access and creates a clear operating model for shared infrastructure.
Apartment charging fails when it is handled one car at a time.
Shared buildings need a coordinated plan for power, parking, billing, fairness and future demand. Pluggy helps strata and building managers move from ad hoc installs to managed EV infrastructure.
Building-ready planning
Assess parking, electrical capacity, common property needs and resident demand before rollout.
Fair access
Support user access, session visibility and billing structures suited to shared environments.
Scalable rollout
Start with the right foundation so more bays can be added as demand increases.
Plan, connect, operate and improve.
Each site type has different users, access rules, energy limits and commercial goals. Pluggy builds the rollout around those realities, then gives hosts the operating layer to manage the site after launch.
Assess the building
Review switchboard capacity, parking layout, resident needs and governance requirements.
Design the rollout
Plan chargers, shared infrastructure, access rules, payment flows and load management.
Operate fairly
Monitor usage, manage access and support expansion as more residents switch to EVs.
Built for hosts who need more than hardware.
Pluggy is positioned as a CPO and operating partner: site design, installation coordination, charger connection, live visibility, billing, support and energy optimisation.
Commercial clarity
Make charging decisions around site goals, driver behaviour, access and utilisation.
Reliable operations
Give hosts and drivers a stronger experience through monitoring, remote actions and support.
Future energy
Prepare sites for smarter charging, storage, renewable integration and bidirectional energy.
Explore connected commercial use cases.
Plan apartment EV charging before demand overwhelms the building.
Pluggy can help your strata committee or building manager design a practical charging pathway.
